Thursday, November 11, 2010

Terex SHM Highwall Mining System - Video and News

The system can produce 40,000 to 120,000 tons (110,000 mt) of coal per month depending on seam height, and can mine coal seams ranging from 30 in to 11.6 ft (0,76 m to 3,5 m) with depths to 1,000 ft (300 m).

Click the figure below to view the Terex SHM Highwall Mining System Video and News.